Project capability

What we deliver beyond the box: the engineering conversation, the documentation pack and the logistics plan. We list our own scope here rather than borrowing someone else's project photos.

Residential

Single-home batteries from 5.12 kWh, parallel banks to 75 kWh on the 51.2 V platform and to 230 kWh on the stackable range.

Small commercial

112.53–225.07 kWh racks and outdoor cabinets for retail, offices, workshops and small industrial sites.

Integrated C&I

125 kW / 265 kWh all-in-one cabinets with integrated PCS, MPPT and ATS for peak shaving, PV self-consumption and genset hybrid sites.

Containers

2.5 MW / 5.02 MWh liquid-cooled units, multi-unit layouts, engineered per site.

How a project runs

1 — Requirements and sizing

Load profile, duty cycle, site conditions, destination country, certification target and the inverter or PCS if already selected. Output: one or two candidate models with the reasoning.

2 — Documentation review

Before any commercial commitment we send the data sheet, the transport documents and the certificate list that applies, plus a written note of anything that has to be arranged locally.

3 — Branding and configuration freeze

Silkscreen, nameplate, manual language, packaging and the configuration of the delivered bank are frozen in writing. Change control after this point is what causes delays.

4 — Production and inspection

Production to the agreed schedule with a pre-shipment check against the frozen specification. Third-party inspection can be arranged at your cost.

5 — Logistics

Sea freight as class 9 dangerous goods, origin documents prepared per booking, unloading and lifting plan agreed with your site team before the goods leave.

6 — Commissioning and after-sales

Commissioning is normally done by your installer, with remote technical support from us. Where the model supports remote diagnostics, faults are read before anyone travels.

What we need from a project site

ItemWhy we ask
Grid voltage, frequency and transformer capacityDecides whether the system can be grid-tied and what protection is needed
Available footprint and access routeA 225 kWh cabinet is 2.5 t; a container is 45 t
Ambient temperature rangeAffects cooling choice and whether an outdoor cabinet is viable
Duty cycle per daySets the warranty conversation — cycle life is a published figure and cycles are consumed
Who unloads and who commissionsAgreed in writing before shipment, not on the day of delivery

Have a project on the table?

Send the site data and the duty cycle. We will come back with a configuration, the documents available for that market and a schedule we can hold.

WhatsApp